poltegor@igo.wroc.pl (+48) 71 34 88 200

Select your language

logo bip

Wcag ikonka

wcag
wcag
wcag
wcag
wcag
wcag

Realizations

Declaration of accessibility

Biotechnology

  • Analysis of metal content using the ICP-OES method in solutions after leaching (Co, Cu, Ni, Li) and after dissolving battery powder” – 2023 Wrocław University of Science and Technology,
  • Laboratory tests of underground and surface water samples from 27 points in the area under the influence of the “Konrad” mine. As part of “Monitoring of underground and surface water in the area under the influence of the “Konrad” mine – measurements and annual report in 2021-2023″,
  • Laboratory tests of underground water samples from 10 piezometers in the area of the potential impact of the Ścinawa barrage on groundwater as part of: “Construction and detailed design for the construction of the “Ścinawa” barrage on the Oder River, with obtaining a decision on the investment permit”,
  • Laboratory tests of underground water samples from 14 piezometers in the area of the potential impact of the “Lubiąż” barrage on groundwater in 2020 as part of: “Construction and detailed design for the construction of the “Lubiąż” barrage on the Oder River, in the area of the village of Gliniany, with obtaining a decision on the permit for the implementation of the investment”,
  • Monitoring of surface, leachate water and groundwater in the area of the “Groszowice” Combustion Waste Landfill in 2018-2020,
  • Monitoring of the water environment in the area of the furnace waste dump in 2017 on the internal heap of the PGE GiEK S.A. KWB Bełchatów Branch. Laboratory tests of the quality of underground and surface water, including sampling and delivery to the laboratory,
  • Monitoring of the water environment in the area of the furnace waste dump in 2015 and 2016 on the internal heap of the PGE GiEK S.A. KWB Bełchatów Branch. Laboratory tests of the quality of underground and surface water, including sampling and delivery to the laboratory.